  <title>New Jersey Partial Internet Outage</title>
  <description>
    Type: Incident
    Duration: 15 minutes

    Affected Components: 15 Enterprise Ave N - Secaucus, NJ
    Mar 21, 16:08:00 GMT+0 - Identified - In the early morning hours of March 21st, our network engineers began deploying a new DDoS protection solution. During this process, one of the network devices became unresponsive, which resulted in the service disruption. We are currently coordinating with local teams to dispatch an onsite technician to diagnose and resolve the issue. Mar 21, 16:09:06 GMT+0 - Identified - A technician is currently onsite and has begun actively diagnosing the issue. They are performing a full assessment of the affected hardware and network components to identify the root cause. Further updates will be provided as progress is made and more information becomes available. Mar 21, 16:22:41 GMT+0 - Resolved - This incident has been resolved, we performed a power reset on the switch and connectivity was restored. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 15 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 21&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;16:08:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  In the early morning hours of March 21st, our network engineers began deploying a new DDoS protection solution. During this process, one of the network devices became unresponsive, which resulted in the service disruption. We are currently coordinating with local teams to dispatch an onsite technician to diagnose and resolve the issue..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 21&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;16:09:06&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  A technician is currently onsite and has begun actively diagnosing the issue. They are performing a full assessment of the affected hardware and network components to identify the root cause. Further updates will be provided as progress is made and more information becomes available..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 21&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;16:22:41&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved, we performed a power reset on the switch and connectivity was restored..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Sat, 21 Mar 2026 16:08:00 +0000</pubDate>
  <link>https://status.goodleafdev.com/incident/cmn0iuyj20a16hucmnwd7yjlu</link>
  <guid>https://status.goodleafdev.com/incident/cmn0iuyj20a16hucmnwd7yjlu</guid>
</item>

<item>
  <title>5th floor to 4th floor Miami Migration</title>
  <description>
    Type: Maintenance
    Duration: 4 hours

    Affected Components: Miami Node 3 E5-2697 V4, Miami Node 1 Gold 6154, Miami Node 1 E5-2697 V4, Miami Node 2 5950x, Miami Node 3 7950x, Miami Node 2 E5-2697A V4, Miami Node 1 7950x, r02.mia.glh.ch
    Feb 5, 02:00:00 GMT+0 - Identified - We are planning for a scheduled maintenance during that time. Feb 5, 02:00:01 GMT+0 - Identified - Maintenance is now in progress Feb 5, 06:00:00 GMT+0 - Completed - Maintenance has completed successfully 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 4 hours</p>
    <p><strong>Affected Components:</strong> , , , , , , , </p>
    &lt;p&gt;&lt;small&gt;Feb &lt;var data-var=&#039;date&#039;&gt; 5&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;02:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are planning for a scheduled maintenance during that time..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Feb &lt;var data-var=&#039;date&#039;&gt; 5&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;02:00:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Feb &lt;var data-var=&#039;date&#039;&gt; 5&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;06:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully.&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Thu, 5 Feb 2026 02:00:00 +0000</pubDate>
  <link>https://status.goodleafdev.com/maintenance/cml8r97ug02wg11a4gqmzll71</link>
  <guid>https://status.goodleafdev.com/maintenance/cml8r97ug02wg11a4gqmzll71</guid>
</item>

<item>
  <title>Cmos batter replacement</title>
  <description>
    Type: Maintenance
    Duration: 1 hour

    Affected Components: Miami Node 1 7950x
    Dec 9, 23:00:01 GMT+0 - Identified - Maintenance is now in progress Dec 10, 00:00:00 GMT+0 - Completed - Maintenance has completed successfully Dec 9, 23:00:00 GMT+0 - Identified - We are planning for a scheduled maintenance during that time. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 1 hour</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 9&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;23:00:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 10&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;00:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 9&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;23:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are planning for a scheduled maintenance during that time..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Tue, 9 Dec 2025 23:00:00 +0000</pubDate>
  <link>https://status.goodleafdev.com/maintenance/cmitn12lz0cijvakzvk0dypoh</link>
  <guid>https://status.goodleafdev.com/maintenance/cmitn12lz0cijvakzvk0dypoh</guid>
</item>

<item>
  <title>Miami Network Transit Upgrade Notice</title>
  <description>
    Type: Maintenance
    Duration: 4 days and 1 hour

    Affected Components: ColoHouse 36 NE 2nd St 5th Floor - Miami, FL, ColoHouse 36 NE 2nd St 4th Floor - Miami, FL
    Dec 3, 22:00:01 GMT+0 - Identified - Maintenance is now in progress Dec 4, 22:00:00 GMT+0 - Completed - Maintenance has completed successfully Dec 6, 01:21:26 GMT+0 - Identified - Maintenance is now in progress. Dec 3, 22:00:00 GMT+0 - Identified - &gt; We will be transitioning from datacenter-provided transit to our own direct GTT network transit to improve routing efficiency, reliability, and overall network performance. This change allows us to have full control over our routing policies, enhance redundancy, and ensure lower latency connectivity across all regions.
&gt; 
&gt; As part of this upgrade, our Miami location will receive a major capacity boost with **2×200 GbE redundant uplinks (400 Gbps total)**. This will significantly increase throughput and provide additional failover protection in the event of a link disruption.
&gt; 
&gt; During this migration, brief routing adjustments may occur as traffic is rebalanced across the new links. We do not expect any downtime, but minor routing changes may be visible for a short period.
&gt; 
&gt; These upgrades are part of our continued efforts to deliver higher performance, improved resilience, and more consistent network quality to all GoodLeaf customers. Dec 7, 23:00:00 GMT+0 - Completed - Maintenance has completed successfully 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 4 days and 1 hour</p>
    <p><strong>Affected Components:</strong> , </p>
    &lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 3&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;22:00:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 4&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;22:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 6&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;01:21:26&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 3&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;22:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  &gt; We will be transitioning from datacenter-provided transit to our own direct GTT network transit to improve routing efficiency, reliability, and overall network performance. This change allows us to have full control over our routing policies, enhance redundancy, and ensure lower latency connectivity across all regions.
&gt; 
&gt; As part of this upgrade, our Miami location will receive a major capacity boost with **2×200 GbE redundant uplinks (400 Gbps total)**. This will significantly increase throughput and provide additional failover protection in the event of a link disruption.
&gt; 
&gt; During this migration, brief routing adjustments may occur as traffic is rebalanced across the new links. We do not expect any downtime, but minor routing changes may be visible for a short period.
&gt; 
&gt; These upgrades are part of our continued efforts to deliver higher performance, improved resilience, and more consistent network quality to all GoodLeaf customers..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 7&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;23:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully.&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Wed, 3 Dec 2025 22:00:00 +0000</pubDate>
  <link>https://status.goodleafdev.com/maintenance/cmhjx6j8q01hq9y1mgk4opaxw</link>
  <guid>https://status.goodleafdev.com/maintenance/cmhjx6j8q01hq9y1mgk4opaxw</guid>
</item>

<item>
  <title>5th Floor Connectivity Loss</title>
  <description>
    Type: Incident
    Duration: 37 minutes

    Affected Components: ColoHouse 36 NE 2nd St 5th Floor - Miami, FL
    Dec 1, 16:35:08 GMT+0 - Identified - Hello,

  
We are currently investigating an incident involving loss of communication with all devices on the 5th floor. The datacenter has informed us that other customers are experiencing similar issues. Based on the available information, we suspect a power outage affecting the 5th floor. Dec 1, 17:11:50 GMT+0 - Resolved - This incident has been resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 37 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 1&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;16:35:08&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Hello,

  
We are currently investigating an incident involving loss of communication with all devices on the 5th floor. The datacenter has informed us that other customers are experiencing similar issues. Based on the available information, we suspect a power outage affecting the 5th floor..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 1&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;17:11:50&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Mon, 1 Dec 2025 16:35:08 +0000</pubDate>
  <link>https://status.goodleafdev.com/incident/cminde4oz005rlws1pznjxhrr</link>
  <guid>https://status.goodleafdev.com/incident/cminde4oz005rlws1pznjxhrr</guid>
</item>

<item>
  <title>Network Incident Update</title>
  <description>
    Type: Incident
    

    Affected Components: ColoHouse 36 NE 2nd St 5th Floor - Miami, FL, ColoHouse 36 NE 2nd St 4th Floor - Miami, FL
    Dec 1, 00:50:14 GMT+0 - Resolved - Earlier today we experienced a service disruption caused by a device in a customer colocation environment that began responding to ARP requests for IP addresses not assigned to it. This resulted in abnormal traffic levels that affected network stability.

To protect the platform, we disabled the affected ports and isolated the source. Service has since been restored, and there is no ongoing impact.

We are working with the customer involved to ensure the issue is fully resolved and does not recur. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    
    <p><strong>Affected Components:</strong> , </p>
    &lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 1&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;00:50:14&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  Earlier today we experienced a service disruption caused by a device in a customer colocation environment that began responding to ARP requests for IP addresses not assigned to it. This resulted in abnormal traffic levels that affected network stability.

To protect the platform, we disabled the affected ports and isolated the source. Service has since been restored, and there is no ongoing impact.

We are working with the customer involved to ensure the issue is fully resolved and does not recur..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Mon, 1 Dec 2025 00:50:14 +0000</pubDate>
  <link>https://status.goodleafdev.com/incident/cmimfmzbe0fdakmm69ddx8n2b</link>
  <guid>https://status.goodleafdev.com/incident/cmimfmzbe0fdakmm69ddx8n2b</guid>
</item>

<item>
  <title>NJ EWR5-A: UPS 1A1 / USS 1B1 Maintenance Main Tie</title>
  <description>
    Type: Maintenance
    Duration: 2 days and 9 hours

    Affected Components: r01.ewr.glh.cs
    Nov 1, 13:00:00 GMT+0 - Identified - Loss of Redundancy - No impact to services. Nov 1, 13:00:01 GMT+0 - Identified - Maintenance is now in progress Nov 3, 22:00:00 GMT+0 - Completed - Maintenance has completed successfully 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 2 days and 9 hours</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Nov &lt;var data-var=&#039;date&#039;&gt; 1&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;13:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Loss of Redundancy - No impact to services..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Nov &lt;var data-var=&#039;date&#039;&gt; 1&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;13:00:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Nov &lt;var data-var=&#039;date&#039;&gt; 3&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;22:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully.&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Sat, 1 Nov 2025 13:00:00 +0000</pubDate>
  <link>https://status.goodleafdev.com/maintenance/cmhdyd3e600z2pmrrb6b3mkwq</link>
  <guid>https://status.goodleafdev.com/maintenance/cmhdyd3e600z2pmrrb6b3mkwq</guid>
</item>

<item>
  <title>Datacenter power outage NY</title>
  <description>
    Type: Incident
    Duration: 2 hours and 43 minutes

    Affected Components: QTS 101 Possumtown Rd - Secaucus, NJ, 15 Enterprise Ave N - Secaucus, NJ
    Oct 22, 16:00:03 GMT+0 - Identified - We are continuing to work on a fix for this incident. The datacenter has notified us its a issue related to their electrical switches. Oct 22, 17:30:44 GMT+0 - Resolved - This incident has been resolved. Oct 22, 14:47:41 GMT+0 - Identified - We are continuing to work on a fix for this incident. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 2 hours and 43 minutes</p>
    <p><strong>Affected Components:</strong> , </p>
    &lt;p&gt;&lt;small&gt;Oct &lt;var data-var=&#039;date&#039;&gt; 22&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;16:00:03&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are continuing to work on a fix for this incident. The datacenter has notified us its a issue related to their electrical switches..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Oct &lt;var data-var=&#039;date&#039;&gt; 22&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;17:30:44&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Oct &lt;var data-var=&#039;date&#039;&gt; 22&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;14:47:41&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are continuing to work on a fix for this incident..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Wed, 22 Oct 2025 14:47:41 +0000</pubDate>
  <link>https://status.goodleafdev.com/incident/cmh23xvwx0046q8y80cdagakm</link>
  <guid>https://status.goodleafdev.com/incident/cmh23xvwx0046q8y80cdagakm</guid>
</item>

<item>
  <title>Miami internet outage</title>
  <description>
    Type: Incident
    Duration: 31 minutes

    Affected Components: ColoHouse 36 NE 2nd St 5th Floor - Miami, FL, ColoHouse 36 NE 2nd St 4th Floor - Miami, FL
    Sep 23, 23:27:26 GMT+0 - Investigating - We are currently investigating this incident. Sep 23, 23:58:21 GMT+0 - Resolved - This incident has been resolved. Issue with path 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 31 minutes</p>
    <p><strong>Affected Components:</strong> , </p>
    &lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 23&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;23:27:26&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are currently investigating this incident..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 23&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;23:58:21&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved. Issue with path.&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Tue, 23 Sep 2025 23:27:26 +0000</pubDate>
  <link>https://status.goodleafdev.com/incident/cmfx6qllc0014li3c9ciggbxe</link>
  <guid>https://status.goodleafdev.com/incident/cmfx6qllc0014li3c9ciggbxe</guid>
</item>

<item>
  <title>Billing area / website down</title>
  <description>
    Type: Incident
    Duration: 36 minutes

    Affected Components: billing.goodleafdev.com, virt.goodleafdev.com, goodleafdev.com, Tampa Web Hosting Node 1 | E5-4640 v4
    Sep 10, 06:00:01 GMT+0 - Resolved - This incident has been resolved. Sep 10, 05:24:03 GMT+0 - Identified - We are continuing to work on a fix for this incident. The rack hosting our web services is experiencing a PDU issue, which is currently being resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 36 minutes</p>
    <p><strong>Affected Components:</strong> , , , </p>
    &lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 10&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;06:00:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 10&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;05:24:03&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are continuing to work on a fix for this incident. The rack hosting our web services is experiencing a PDU issue, which is currently being resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Wed, 10 Sep 2025 05:24:03 +0000</pubDate>
  <link>https://status.goodleafdev.com/incident/cmfdjbb83007oojejsgdn9n6h</link>
  <guid>https://status.goodleafdev.com/incident/cmfdjbb83007oojejsgdn9n6h</guid>
</item>

<item>
  <title>Dallas Internet Outage</title>
  <description>
    Type: Incident
    Duration: 15 minutes

    Affected Components: Centersquare 14901 FAA BLVD - Dallas, TX
    Aug 12, 05:15:00 GMT+0 - Investigating - We are currently investigating this incident. Aug 12, 05:20:00 GMT+0 - Identified - We have identified the issue as originating from a third-party upstream provider and are currently working with them to resolve it. Aug 12, 05:30:00 GMT+0 - Resolved - This incident has been resolved with the third-party upstream provider. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 15 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 12&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;05:15:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are currently investigating this incident..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 12&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;05:20:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We have identified the issue as originating from a third-party upstream provider and are currently working with them to resolve it..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 12&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;05:30:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved with the third-party upstream provider..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Tue, 12 Aug 2025 05:15:00 +0000</pubDate>
  <link>https://status.goodleafdev.com/incident/cme842wg3006cg6pq2dsiugms</link>
  <guid>https://status.goodleafdev.com/incident/cme842wg3006cg6pq2dsiugms</guid>
</item>

<item>
  <title>New Jersey Node 1 Intel Failing to Start</title>
  <description>
    Type: Incident
    Duration: 10 minutes

    Affected Components: New Jersey Node 1 E5-2697A V4
    Jul 26, 21:31:25 GMT+0 - Resolved - This incident has been resolved. Jul 26, 21:21:55 GMT+0 - Investigating - We are currently investigating this incident. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 10 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 26&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;21:31:25&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 26&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;21:21:55&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are currently investigating this incident..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Sat, 26 Jul 2025 21:21:55 +0000</pubDate>
  <link>https://status.goodleafdev.com/incident/cmdkr9wwd00l0nrvl3rlsz0ks</link>
  <guid>https://status.goodleafdev.com/incident/cmdkr9wwd00l0nrvl3rlsz0ks</guid>
</item>

<item>
  <title>Cable Management of Rack 1 Miami</title>
  <description>
    Type: Maintenance
    Duration: 3 hours

    Affected Components: r01.mia.glh.ch, ColoHouse 36 NE 2nd St 4th Floor - Miami, FL
    May 27, 14:00:00 GMT+0 - Completed - Maintenance has completed successfully May 27, 11:00:01 GMT+0 - Identified - Maintenance is now in progress May 27, 11:00:00 GMT+0 - Identified - We are planning to re cable manage our Mimai cabinet, this maintenance will only affect colocation and dedicated server rental clients. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 3 hours</p>
    <p><strong>Affected Components:</strong> , </p>
    &lt;p&gt;&lt;small&gt;May &lt;var data-var=&#039;date&#039;&gt; 27&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;14:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;May &lt;var data-var=&#039;date&#039;&gt; 27&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;11:00:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;May &lt;var data-var=&#039;date&#039;&gt; 27&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;11:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are planning to re cable manage our Mimai cabinet, this maintenance will only affect colocation and dedicated server rental clients..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Tue, 27 May 2025 11:00:00 +0000</pubDate>
  <link>https://status.goodleafdev.com/maintenance/cmb5g990p008r5wulkf2dmjiq</link>
  <guid>https://status.goodleafdev.com/maintenance/cmb5g990p008r5wulkf2dmjiq</guid>
</item>

<item>
  <title>Server Migration to New Miami Cabinet</title>
  <description>
    Type: Maintenance
    Duration: 6 hours

    Affected Components: Miami Node 2 5950x, Miami Node 2 E5-2697A V4, r01.mia.glh.ch, Miami Node 3 E5-2697 V4, Miami Node 1 Gold 6154, Miami Node 1 E5-2697 V4
    May 20, 15:30:01 GMT+0 - Identified - Maintenance is now in progress May 20, 15:30:00 GMT+0 - Identified - We are planning to migrate existing servers to a new cabinet inside the same facility in our Miami, FL datecenter for vps / vds customers only. May 20, 21:30:00 GMT+0 - Completed - Maintenance has completed successfully 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 6 hours</p>
    <p><strong>Affected Components:</strong> , , , , , </p>
    &lt;p&gt;&lt;small&gt;May &lt;var data-var=&#039;date&#039;&gt; 20&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;15:30:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;May &lt;var data-var=&#039;date&#039;&gt; 20&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;15:30:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are planning to migrate existing servers to a new cabinet inside the same facility in our Miami, FL datecenter for vps / vds customers only..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;May &lt;var data-var=&#039;date&#039;&gt; 20&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;21:30:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully.&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Tue, 20 May 2025 15:30:00 +0000</pubDate>
  <link>https://status.goodleafdev.com/maintenance/cmabuumni002ag1g3vycscu5g</link>
  <guid>https://status.goodleafdev.com/maintenance/cmabuumni002ag1g3vycscu5g</guid>
</item>

<item>
  <title>Cooling Issues in Miami Datacenter</title>
  <description>
    Type: Incident
    Duration: 4 days, 23 hours and 14 minutes

    Affected Components: Miami Node 3 E5-2697 V4, r01.mia.glh.ch
    Mar 17, 11:48:41 GMT+0 - Monitoring - Update from Hivelocity / Colohouse

&quot;We currently have a HVAC unit near your space that is being looked at by our HVAC vendor. Apologies for any inconvenience this may cause.&quot; Mar 17, 08:35:00 GMT+0 - Monitoring - We are currently observing increased CPU load on Miami Node 3 (Intel Budget) due to a cooling-related event at the Miami data center. Our team is actively monitoring the situation and working closely with the data center to mitigate any potential impact on performance.

We will provide further updates as the situation develops. Thank you for your patience and understanding. Mar 22, 07:48:42 GMT+0 - Resolved - CRAC 5 has been repaired in back online at 100%. Temperatures are already improving and should be ideal in the next few hours.  
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 4 days, 23 hours and 14 minutes</p>
    <p><strong>Affected Components:</strong> , </p>
    &lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 17&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;11:48:41&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Monitoring&lt;/strong&gt; -
  Update from Hivelocity / Colohouse

&quot;We currently have a HVAC unit near your space that is being looked at by our HVAC vendor. Apologies for any inconvenience this may cause.&quot;.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 17&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;08:35:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Monitoring&lt;/strong&gt; -
  We are currently observing increased CPU load on Miami Node 3 (Intel Budget) due to a cooling-related event at the Miami data center. Our team is actively monitoring the situation and working closely with the data center to mitigate any potential impact on performance.

We will provide further updates as the situation develops. Thank you for your patience and understanding..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 22&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;07:48:42&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  CRAC 5 has been repaired in back online at 100%. Temperatures are already improving and should be ideal in the next few hours. .&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Mon, 17 Mar 2025 08:35:00 +0000</pubDate>
  <link>https://status.goodleafdev.com/incident/cm8ct7lkh0024ld1gsgft3fmj</link>
  <guid>https://status.goodleafdev.com/incident/cm8ct7lkh0024ld1gsgft3fmj</guid>
</item>

<item>
  <title>Packetloss / Network Connectivity Issues</title>
  <description>
    Type: Incident
    Duration: 44 minutes

    Affected Components: ColoHouse 36 NE 2nd St 4th Floor - Miami, FL, Equinix AM5 - Amsterdam, NL, 15 Enterprise Ave N - Secaucus, NJ, QTS 101 Possumtown Rd - Secaucus, NJ, Hivelocity One Wilshire - Los Angeles, CA, Centersquare 14901 FAA BLVD - Dallas, TX
    Mar 9, 23:43:09 GMT+0 - Resolved - This incident has been resolved. Mar 9, 22:59:14 GMT+0 - Identified - We are currently experiencing some packet loss across the network while Path works to mitigate a large attack. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 44 minutes</p>
    <p><strong>Affected Components:</strong> , , , , , </p>
    &lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 9&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;23:43:09&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 9&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;22:59:14&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are currently experiencing some packet loss across the network while Path works to mitigate a large attack..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Sun, 9 Mar 2025 22:59:14 +0000</pubDate>
  <link>https://status.goodleafdev.com/incident/cm828jonp000rpedxf1siw8wm</link>
  <guid>https://status.goodleafdev.com/incident/cm828jonp000rpedxf1siw8wm</guid>
</item>

<item>
  <title>Miami node 2 Intel Maintence Completion</title>
  <description>
    Type: Maintenance
    Duration: 23 minutes

    Affected Components: Miami Node 2 E5-2697A V4
    Sep 27, 22:11:15 GMT+0 - Completed - Maintenance has completed successfully. Sep 27, 21:48:22 GMT+0 - Identified - We are planning to reboot the Miami node 2 intel node for scheduled maintence 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 23 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 27&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;22:11:15&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 27&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;21:48:22&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are planning to reboot the Miami node 2 intel node for scheduled maintence.&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Fri, 27 Sep 2024 21:48:22 +0000</pubDate>
  <link>https://status.goodleafdev.com/maintenance/cm1l99iic0009tmin6wim1rax</link>
  <guid>https://status.goodleafdev.com/maintenance/cm1l99iic0009tmin6wim1rax</guid>
</item>

<item>
  <title>Storage Expansion Miami Node 2 Intel</title>
  <description>
    Type: Maintenance
    Duration: 1 hour and 4 minutes

    Affected Components: Miami Node 2 E5-2697A V4
    Sep 9, 20:13:48 GMT+0 - Completed - We have completed the expansion of the existing raid array Sep 9, 20:05:00 GMT+0 - Identified - We are planning for a scheduled maintenance during that time where we will expand the storage capacity of the server. Sep 9, 19:10:01 GMT+0 - Identified - Maintenance is now in progress 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 1 hour and 4 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 9&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;20:13:48&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  We have completed the expansion of the existing raid array.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 9&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;20:05:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are planning for a scheduled maintenance during that time where we will expand the storage capacity of the server..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 9&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;19:10:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Mon, 9 Sep 2024 20:05:00 +0000</pubDate>
  <link>https://status.goodleafdev.com/maintenance/cm0v6zm2v001a11845hkn5ivf</link>
  <guid>https://status.goodleafdev.com/maintenance/cm0v6zm2v001a11845hkn5ivf</guid>
</item>

<item>
  <title>Miami Node 1 Server Move</title>
  <description>
    Type: Maintenance
    Duration: 1 hour

    Affected Components: Miami Node 1 E5-2697 V4
    Sep 7, 01:15:00 GMT+0 - Identified - We are planning to move Miami node 1 to a cooler section of the cabinet since we are noticing performence issues with the cpu due to tempatures. Sep 7, 01:15:01 GMT+0 - Identified - Maintenance is now in progress Sep 7, 02:15:00 GMT+0 - Completed - Maintenance has completed successfully 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 1 hour</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 7&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;01:15:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are planning to move Miami node 1 to a cooler section of the cabinet since we are noticing performence issues with the cpu due to tempatures..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 7&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;01:15:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 7&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;02:15:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully.&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Sat, 7 Sep 2024 01:15:00 +0000</pubDate>
  <link>https://status.goodleafdev.com/maintenance/cm0rfvsll0018124ut9s07ec1</link>
  <guid>https://status.goodleafdev.com/maintenance/cm0rfvsll0018124ut9s07ec1</guid>
</item>

<item>
  <title>Miami Outage</title>
  <description>
    Type: Incident
    Duration: 3 hours and 32 minutes

    Affected Components: ColoHouse 36 NE 2nd St 4th Floor - Miami, FL
    Aug 23, 17:38:02 GMT+0 - Investigating - We are currently investigating this incident. Aug 23, 18:08:39 GMT+0 - Monitoring - We have successfully restored internet connectivity by switching to OOB (Out-of-Band) and establishing a GRE tunnel to Path. We will keep the GRE tunnel active until our upstream provider, Path, is fully operational. Aug 23, 21:10:26 GMT+0 - Resolved - We have switched back to path and everything is operational Aug 23, 17:46:04 GMT+0 - Identified - We have identified that our upstream provider Path has gone offline in Miami, we are going to fall over to our oob for upstream Aug 23, 17:56:41 GMT+0 - Monitoring - We implemented a fix and are currently monitoring the result. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 3 hours and 32 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 23&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;17:38:02&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are currently investigating this incident..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 23&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;18:08:39&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Monitoring&lt;/strong&gt; -
  We have successfully restored internet connectivity by switching to OOB (Out-of-Band) and establishing a GRE tunnel to Path. We will keep the GRE tunnel active until our upstream provider, Path, is fully operational..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 23&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;21:10:26&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  We have switched back to path and everything is operational.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 23&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;17:46:04&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We have identified that our upstream provider Path has gone offline in Miami, we are going to fall over to our oob for upstream.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 23&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;17:56:41&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Monitoring&lt;/strong&gt; -
  We implemented a fix and are currently monitoring the result..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Fri, 23 Aug 2024 17:38:02 +0000</pubDate>
  <link>https://status.goodleafdev.com/incident/cm06zvwql000sbqxd021qyt1v</link>
  <guid>https://status.goodleafdev.com/incident/cm06zvwql000sbqxd021qyt1v</guid>
</item>

<item>
  <title>Ram Installation New Jersey Node 1 Intel+</title>
  <description>
    Type: Maintenance
    Duration: 35 minutes

    Affected Components: New Jersey Node 1 Gold 6154
    Aug 22, 01:00:01 GMT+0 - Identified - Maintenance is now in progress Aug 22, 01:35:27 GMT+0 - Completed - Maintenance has completed successfully. Aug 22, 01:00:00 GMT+0 - Identified - We are planning for a scheduled maintenance during that time. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 35 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 22&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;01:00:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 22&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;01:35:27&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 22&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;01:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are planning for a scheduled maintenance during that time..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Thu, 22 Aug 2024 01:00:00 +0000</pubDate>
  <link>https://status.goodleafdev.com/maintenance/cm04jpug4000ejrbfwms3dhgk</link>
  <guid>https://status.goodleafdev.com/maintenance/cm04jpug4000ejrbfwms3dhgk</guid>
</item>

<item>
  <title>Cooling Failure in the Miami Datacenter</title>
  <description>
    Type: Incident
    Duration: 21 hours and 38 minutes

    Affected Components: Miami Node 2 5950x, Miami Node 3 E5-2697 V4, Miami Node 2 E5-2697A V4, r01.mia.glh.ch, Miami Node 1 Gold 6154, Miami Node 1 E5-2697 V4
    Aug 8, 15:22:11 GMT+0 - Resolved - We have identified a cooling failure in our Miami datacenter, resulting in temperature spikes as high as 75°C. Aug 8, 22:23:04 GMT+0 - Monitoring - We have identified a cooling failure in our Miami datacenter, resulting in temperature spikes as high as 75°C. Aug 9, 13:00:27 GMT+0 - Resolved - This incident has been resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 21 hours and 38 minutes</p>
    <p><strong>Affected Components:</strong> , , , , , </p>
    &lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 8&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;15:22:11&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  We have identified a cooling failure in our Miami datacenter, resulting in temperature spikes as high as 75°C..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 8&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;22:23:04&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Monitoring&lt;/strong&gt; -
  We have identified a cooling failure in our Miami datacenter, resulting in temperature spikes as high as 75°C..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 9&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;13:00:27&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Thu, 8 Aug 2024 15:22:11 +0000</pubDate>
  <link>https://status.goodleafdev.com/incident/clzlfffty242113gzoftyd3w2p8</link>
  <guid>https://status.goodleafdev.com/incident/clzlfffty242113gzoftyd3w2p8</guid>
</item>

  </channel>
  </rss>